TRISHULI, Oct 18: A suspension bridge has been constructed to restore connectivity and facilitate movement in the affected region after the Bhotekoshi flood destroyed two concrete bridges spanning the Trishuli River in Bidur Municipality-1, Nuwakot.
Although incomplete, the bridge connecting Dhunge and Trishuli Bazaar has been opened to the public in response to the urgent needs of local residents. Since the flood on August 26 destroyed the previous bridges, residents have been forced to use tuin and zipline systems to cross the river.
Related story
Walk in the clouds: World’s longest pedestrian suspension bridg...
The situation proved particularly challenging for residents of riverside settlements, notably Trishuli Bazaar, which sustained direct damage from the flood. The opening of the suspension bridge has significantly improved accessibility for local residents and facilitated the transport of relief supplies and rehabilitation materials.
According to Shailendraraj Pyakurel, president of the Nuwakot Builders' Association, the decision to open the bridge followed the completion of its main structural components, prioritizing the welfare of local communities.
Remaining work includes installing auxiliary support cables at four locations on each side of the bridge.
“This is the first crossing structure constructed following the Bhotekoshi flood damage to the Trishuli River,” Pyakurel said.
Bidur Municipality Mayor Rajan Shrestha said the destruction of the concrete bridges had forced residents to use hazardous crossing methods. He said the suspension bridge now allows people to cross the river more safely, replacing their previous reliance on tuin and zipline systems.
